Send drawings for a quote
B—R Automotive

Plastic injection moulding and metal stamping for automotive

Six Czech plants certified to IATF 16949, 220 moulding machines and an in-house toolroom in each. We take over third-party tools, measure them and ramp up the series.

220+machines 25–2,300 t
IATF 16949all 6 plants
2K / 3Koptics and light guides
Automotive OEM and Tier 1

What we make for you

01

Technical and optical plastics

2K and 3K moulding, thick-walled optical parts and light guides, PVD metallisation, direct compression of BMC and SMC thermosets.

02

Metal stampings and assembly

Progressive and transfer stamping up to 500 tonnes, spot welding, vacuum degreasing and automated assembly lines.

03

Tooling and third-party tool service

Moulds up to 10 tonnes and stamping tools up to 3 metres from our own toolrooms. We also take over tools bought elsewhere and ramp up the series.

Technology and machine park

  • Injection moulding from 25 to 2,300 tonnes
  • 2K and 3K moulding
  • Thick-walled optical parts and light guides
  • PVD metallisation of thermoplastics
  • Direct compression of thermosets BMC and SMC
  • Progressive and transfer metal stamping up to 500 tonnes
  • Spot welding and automated assembly lines
  • In-house toolroom in every plant

Certifications

IATF 16949ISO 45001ISO 27001 / TISAXISO 26000

Who we produce for

Forvia (Hella)Marelli Automotive LightingOPmobilityBoschSchaefflerAUMOVIO
6plants
220+moulding machines 25–2,300 t
60+presses 10–500 t
IATF 16949all plants

How it works

1

Send drawings

PDF or STEP is enough. Nothing to sign.

2

Quotation in 5 days

You get price, lead time and a proposed manufacturing route.

3

Sample and approval

We make a sample, measure it and supply the reports.

4

Series supply

We deliver against your call-off schedule.

Send us drawings — we reply within two working days

You get a quotation and lead time within five working days. You can also send drawings straight to info@brgroup.cz.

Responsewithin 2 working days
Quotationwithin 5 working days